{"id":3423,"date":"2026-11-15T10:30:00","date_gmt":"2026-11-15T02:30:00","guid":{"rendered":"https:\/\/www.dahaishelf.com\/?p=3423"},"modified":"2026-11-12T12:57:26","modified_gmt":"2026-11-12T04:57:26","slug":"store-fit-out-checklist","status":"publish","type":"post","link":"https:\/\/www.dahaishelf.com\/fr\/store-fit-out-checklist\/","title":{"rendered":"Store Fit-Out Checklist: From Floor Plan to Final Inspection"},"content":{"rendered":"<style>\n  .sa{margin:0 auto;padding:8px 4px 36px;font-family:-apple-system,BlinkMacSystemFont,\"Segoe UI\",Roboto,Helvetica,Arial,sans-serif;color:#30343a;font-size:16.5px;line-height:1.85;letter-spacing:0}\n  .sa *{box-sizing:border-box}\n  .sa-lead{margin:0 0 26px;padding:14px 18px;font-size:17px;line-height:1.75;color:#4a4f56;background:#FBF7F3;border-left:3px solid #E8730C;border-radius:0 6px 6px 0}\n  .sa h2{position:relative;margin:34px 0 12px;padding-left:12px;font-size:20px;line-height:1.5;font-weight:700;color:#1e2227}\n  .sa h2::before{content:\"\";position:absolute;left:0;top:6px;bottom:6px;width:4px;background:#E8730C;border-radius:2px}\n  .sa h3{margin:24px 0 8px;font-size:17px;line-height:1.5;font-weight:700;color:#1e2227}\n  .sa p{margin:0 0 16px}\n  .sa strong{color:#C25A05;font-weight:600}\n  .sa ul{margin:0 0 18px;padding:0;list-style:none}\n  .sa ul li{position:relative;margin:0 0 10px;padding-left:20px}\n  .sa ul li::before{content:\"\";position:absolute;left:2px;top:11px;width:7px;height:7px;background:#E8730C;border-radius:2px;transform:rotate(45deg)}\n  .sa-tip{margin:22px 0;padding:16px 18px;background:#FFF8F1;border:1px dashed rgba(232,115,12,.5);border-radius:8px;font-size:15px;color:#4a4f56}\n  .sa-tip b{display:block;margin-bottom:6px;font-size:12px;letter-spacing:1.4px;text-transform:uppercase;color:#E8730C}\n  .sa-tip p{margin:0}\n  .sa-table{overflow-x:auto;margin:0 0 20px}\n  .sa table{width:100%;min-width:520px;border-collapse:collapse;font-size:14.5px}\n  .sa th{padding:10px 12px;text-align:left;font-weight:600;color:#B8560A;background:#FDF1E6;border-bottom:2px solid #F3D4B8}\n  .sa td{padding:10px 12px;border-bottom:1px solid #eef0f2;color:#454a51}\n  .sa-toc{margin:0 0 24px;padding:16px 20px;background:#FBF7F3;border:1px solid #F3D4B8;border-radius:8px}\n  .sa-toc b{display:block;margin:0 0 8px;font-size:12px;letter-spacing:1.4px;text-transform:uppercase;color:#B8560A}\n  .sa-toc ol{margin:0;padding-left:20px}\n  .sa-toc li{margin:0 0 6px;padding-left:0}\n  .sa-toc li::before{display:none}\n  .sa-toc a{color:#7a4a22;text-decoration:none}\n  .sa-gallery{display:grid;grid-template-columns:repeat(3,minmax(0,1fr));gap:10px;margin:20px 0 24px}\n  .sa-gallery figure{margin:0;background:#fff;border:1px solid #ececec;border-radius:8px;overflow:hidden}\n  .sa-gallery img{display:block;width:100%;aspect-ratio:1\/1;object-fit:cover}\n  .sa-gallery figcaption{padding:8px 10px;font-size:12px;line-height:1.45;color:#7a8088}\n  .sa-end{margin:30px 0 0;padding-top:16px;font-size:14px;color:#8a9096;border-top:1px solid #ececec}\n  .sa-tags{margin:16px 0 0;font-size:0}\n  .sa-tags em{display:inline-block;margin:0 8px 8px 0;padding:3px 10px;font-size:12px;font-style:normal;color:#8a6a4e;background:#F6F1EC;border-radius:20px}\n  @media(max-width:640px){.sa{font-size:15.5px}.sa-gallery{grid-template-columns:1fr}.sa-toc{padding:14px 16px}}\n<\/style>\n\n<div class=\"sa\" lang=\"en\">\n  <p class=\"sa-lead\">A store fit-out goes wrong in the gaps between trades: the shelving arrives before the floor is ready, the checkout blocks the last gondola, or the refrigeration drain has nowhere to go. This checklist follows the order of a real project, from the first floor plan to the final inspection.<\/p>\n\n  <div class=\"wp-block-rank-math-toc-block sa-toc\"><b>In this checklist<\/b><ol>\n    <li><a href=\"#scope\">Define the scope before the floor plan<\/a><\/li>\n    <li><a href=\"#shell\">Measure the shell and the circulation<\/a><\/li>\n    <li><a href=\"#schedule\">Build the shelving and cabinet schedule<\/a><\/li>\n    <li><a href=\"#services\">Coordinate refrigeration, electrical and lighting<\/a><\/li>\n    <li><a href=\"#front\">Plan the front end and checkout<\/a><\/li>\n    <li><a href=\"#logistics\">Set delivery and installation responsibilities<\/a><\/li>\n    <li><a href=\"#handover\">Inspect before handover<\/a><\/li>\n    <li><a href=\"#faq\">Fit-out checklist FAQ<\/a><\/li>\n  <\/ol><\/div>\n\n  <div class=\"sa-gallery\">\n    <figure><img src=\"https:\/\/www.dahaishelf.com\/wp-content\/uploads\/grocery-store-gondola-shelving-supermarket-shelf-01.jpg\" alt=\"Supermarket gondola shelving during a store fit-out\" loading=\"lazy\" decoding=\"async\" title=\"\"><figcaption>Shelving runs set the aisle plan; they are not a late purchase.<\/figcaption><\/figure>\n    <figure><img src=\"https:\/\/www.dahaishelf.com\/wp-content\/uploads\/commercial-supermarket-wooden-display-shelf-with-glass-door-02.jpg\" alt=\"Display cabinet installed in a supermarket fit-out\" loading=\"lazy\" decoding=\"async\" title=\"\"><figcaption>Cabinets need power, access and clearance in the plan.<\/figcaption><\/figure>\n    <figure><img src=\"https:\/\/www.dahaishelf.com\/wp-content\/uploads\/supermarket-shelf-with-checkout-counter-01.jpg\" alt=\"Supermarket checkout counter and shelving layout\" loading=\"lazy\" decoding=\"async\" title=\"\"><figcaption>The front end is a layout decision, not an equipment list.<\/figcaption><\/figure>\n  <\/div>\n\n  <h2 id=\"scope\">1. Define the scope before the floor plan<\/h2>\n  <p>Write down what the project includes and what it excludes. A fit-out that assumes the landlord provides the floor, the electrician provides the power and the shelving supplier provides the layout will stall at the first site meeting.<\/p>\n  <ul>\n    <li>Sales floor, back room, office, toilets and external signage: which areas are in scope?<\/li>\n    <li>New build or refit: what stays, what moves and what is disposed of?<\/li>\n    <li>Refrigeration, lighting, electrical, plumbing and HVAC: who designs and who installs?<\/li>\n    <li>Shelving, display cabinets, checkout and back-room racking: who supplies and who installs?<\/li>\n    <li>Permits, fire approval and opening date: what has to be booked first?<\/li>\n  <\/ul>\n  <p>A simple scope table prevents most of the arguments later. It also tells the shelving supplier which drawings they need before they can quote accurately.<\/p>\n\n  <h2 id=\"shell\">2. Measure the shell and the circulation<\/h2>\n  <p>Measure the building before you draw the store. The drawing should reflect the columns, doors, ceiling height, sprinklers, drains and electrical points that actually exist.<\/p>\n  <ul>\n    <li>Sales-floor dimensions and column grid, including the column faces.<\/li>\n    <li>Ceiling height under beams, ducts and light fixtures.<\/li>\n    <li>Door widths and the route from the loading bay to the sales floor.<\/li>\n    <li>Floor level changes, drains, inspection covers and any weak spots.<\/li>\n    <li>Electrical points, water connections and the main switchboard location.<\/li>\n  <\/ul>\n  <p>Then draw the customer route: entrance, trolley pick-up, first aisle, fresh department, ambient aisles, checkout and exit. The route should not pass through a service door or a staff route. If it does, move the door or change the layout before ordering anything.<\/p>\n\n  <div class=\"sa-tip\"><b>Do this early<\/b><p>Mark the aisle widths on the floor with tape and walk them with a trolley. A layout that looks generous on screen can feel tight when a trolley meets a restocking cage.<\/p><\/div>\n\n  <h2 id=\"schedule\">3. Build the shelving and cabinet schedule<\/h2>\n  <p>The schedule is the bridge between the layout and the purchase order. It should list every run, bay and cabinet, not just the total quantity.<\/p>\n  <div class=\"sa-table\">\n    <table>\n      <thead><tr><th>Schedule field<\/th><th>Why it matters<\/th><th>Example<\/th><\/tr><\/thead>\n      <tbody>\n        <tr><td>Location<\/td><td>Links the item to the drawing<\/td><td>Aisle 3, wall run B<\/td><\/tr>\n        <tr><td>Type<\/td><td>Separates shelving, cabinets and checkout<\/td><td>Double-sided gondola<\/td><\/tr>\n        <tr><td>Size<\/td><td>Controls capacity and aisle clearance<\/td><td>1200 \u00d7 600 \u00d7 1500 mm<\/td><\/tr>\n        <tr><td>Shelf count<\/td><td>Sets capacity and load<\/td><td>5 shelves plus base<\/td><\/tr>\n        <tr><td>Finition<\/td><td>Matches the store design<\/td><td>Powder-coated steel, wood trim<\/td><\/tr>\n        <tr><td>Accessoires<\/td><td>Price tags, dividers, lighting<\/td><td>Price strips, LED shelf lights<\/td><\/tr>\n      <\/tbody>\n    <\/table>\n  <\/div>\n  <p>Use the same schedule for the <a href=\"https:\/\/www.dahaishelf.com\/fr\/product-category\/shop-shelf\/\">\u00e9tag\u00e8re de magasin<\/a>, the display cabinets and the back-room racking. If the schedules are separate, the interfaces \u2014 the end of a gondola, the corner where a cabinet meets a wall \u2014 are the first things to be missed. A <a href=\"https:\/\/www.dahaishelf.com\/fr\/products\/american-style-gondola-shelving-grocery-aisles\/\">double-sided gondola<\/a> et un <a href=\"https:\/\/www.dahaishelf.com\/fr\/product-category\/warehouse-rack\/\">pallet racking run<\/a> may look unrelated, but both depend on the same aisle and delivery plan.<\/p>\n\n  <h2 id=\"services\">4. Coordinate refrigeration, electrical and lighting<\/h2>\n  <p>Services drive the layout more than most buyers expect. A refrigerated cabinet needs power, airflow, a drain and service access. A lighting scheme needs drivers, switching and cable routes. If these are added after the shelving is fixed, the store loses selling space.<\/p>\n  <ul>\n    <li>Confirm the power load and socket positions for every refrigerated cabinet and display light.<\/li>\n    <li>Agree the drain route and fall before the floor is finished.<\/li>\n    <li>Keep service access clear at the back of refrigeration and at the top of tall shelving.<\/li>\n    <li>Check that lighting does not shine directly into glass doors or create heat inside the cabinet.<\/li>\n    <li>Leave spare capacity at the switchboard for future display changes.<\/li>\n  <\/ul>\n  <p>Compare a <a href=\"https:\/\/www.dahaishelf.com\/fr\/products\/two-door-upright-chiller-fresh-produce\/\">refroidisseur vertical \u00e0 deux portes<\/a> with the fresh-department plan, and check the cabinet depth against the aisle before approving the electrical layout.<\/p>\n\n  <h2 id=\"front\">5. Plan the front end and checkout<\/h2>\n  <p>The checkout is the last thing the customer uses and the first place a layout becomes uncomfortable. Start with the number of lanes, the basket and trolley mix, and the space needed for bagging and impulse displays.<\/p>\n  <ul>\n    <li>Allow enough queue space so the line does not block the last gondola.<\/li>\n    <li>Keep the bagging side clear of the walkway and the staff route.<\/li>\n    <li>Plan impulse fixtures as part of the counter, not as an afterthought.<\/li>\n    <li>Check the counter height against the staff and customer sides.<\/li>\n    <li>Confirm the scanner, scale and cash drawer positions before the counter is built.<\/li>\n  <\/ul>\n  <p>A <a href=\"https:\/\/www.dahaishelf.com\/fr\/products\/checkout-counter-conveyor-belt-bulk-baskets\/\">checkout counter with a conveyor belt<\/a> suits a larger basket mix; a compact lane may need a different counter. For a busy front end, compare a <a href=\"https:\/\/www.dahaishelf.com\/fr\/products\/checkout-counter-storage-space-busy-lanes\/\">caisse avec espace de rangement<\/a> against the bagging and queue plan. The right choice depends on the format, not on the catalog page.<\/p>\n\n  <h2 id=\"logistics\">6. Set delivery and installation responsibilities<\/h2>\n  <p>Most fit-out delays are logistics delays. Agree who unloads, who checks the delivery, who stores the goods on site and who installs them. Put it in the purchase order.<\/p>\n  <ul>\n    <li>Delivery address, site contact and accepted delivery hours.<\/li>\n    <li>Whether the price includes unloading, positioning and installation.<\/li>\n    <li>Who supplies fixings, sealant, power connections and final cleaning.<\/li>\n    <li>Where the goods are stored before installation and who is responsible for damage.<\/li>\n    <li>How shortages or transit damage are reported and replaced.<\/li>\n  <\/ul>\n  <p>For a phased opening, sequence the deliveries by zone. Delivering every fixture at once can block the very area the next trade needs to finish.<\/p>\n\n  <h2 id=\"handover\">7. Inspect before handover<\/h2>\n  <p>Walk the store with the drawing and the schedule. Mark every defect on a snag list with a location and a photo, then agree who fixes it and by when.<\/p>\n  <div class=\"sa-table\">\n    <table>\n      <thead><tr><th>Area<\/th><th>What to check<\/th><\/tr><\/thead>\n      <tbody>\n        <tr><td>Shelving<\/td><td>Level runs, secure connections, shelf load, end caps, price strips<\/td><\/tr>\n        <tr><td>Vitrines<\/td><td>Door alignment, glass condition, locks, lighting, temperature pull-down<\/td><\/tr>\n        <tr><td>Checkout<\/td><td>Counter height, scanner and scale fit, bagging space, queue clearance<\/td><\/tr>\n        <tr><td>R\u00e9frig\u00e9ration<\/td><td>Temperature, drain, airflow, noise, service access<\/td><\/tr>\n        <tr><td>Electrical<\/td><td>Sockets, switching, cable protection, spare capacity<\/td><\/tr>\n        <tr><td>Safety<\/td><td>Sharp edges, stability, emergency routes, fire equipment access<\/td><\/tr>\n      <\/tbody>\n    <\/table>\n  <\/div>\n  <p>Run the store for a day before the official opening if possible. A soft opening exposes the real circulation problems: the aisle that is too tight, the cabinet that is loaded from the wrong side, the checkout queue that blocks the exit.<\/p>\n\n  <h2 id=\"faq\">8. Fit-out checklist FAQ<\/h2>\n  <h3>How early should shelving be ordered?<\/h3>\n  <p>Order after the layout and schedule are approved, but before the floor and electrical works are closed up. The exact lead time depends on the specification, quantity and destination; ask the supplier to confirm it in writing.<\/p>\n  <h3>Should I buy shelving and refrigeration from one supplier?<\/h3>\n  <p>One supplier can simplify coordination, but only if the scope and responsibilities are clear. Ask which items are manufactured in-house and which are sourced, and who handles warranty and spare parts for each.<\/p>\n  <h3>What is the most common fit-out mistake?<\/h3>\n  <p>Ordering fixtures before the aisle plan and services are fixed. The second most common is leaving the front end until last, when the checkout has to fit around everything else.<\/p>\n  <h3>How do I compare quotes from different suppliers?<\/h3>\n  <p>Use the same schedule and specification for every quote. Compare the included accessories, installation, delivery, warranty and spare parts \u2014 not just the unit price.<\/p>\n  <h3>What should be on the snag list?<\/h3>\n  <p>Anything that affects safety, operation or appearance: unstable runs, misaligned doors, damaged glass, missing fixings, incorrect lighting, temperature problems and incomplete accessories.<\/p>\n\n  <h2>Sources and standards<\/h2>\n  <p>A fit-out checklist is not a code compliance review. At handover, confirm that exit routes and accessible routes match the approved drawings and the standards your jurisdiction enforces. In the U.S., <a href=\"https:\/\/www.osha.gov\/laws-regs\/regulations\/standardnumber\/1910\/1910.36\" rel=\"nofollow noopener\" target=\"_blank\">OSHA 29 CFR 1910.36<\/a> sets design and construction requirements for exit routes, and the <a href=\"https:\/\/www.ada.gov\/law-and-regs\/design-standards\/2010-stds\/\" rel=\"nofollow noopener\" target=\"_blank\">2010 ADA Standards for Accessible Design<\/a> cover accessible routes, sales and service counters, and checkout aisles. Local building and fire officials make the final determination.<\/p>\n\n  <div class=\"sa-end\">Use this checklist with the <a href=\"https:\/\/www.dahaishelf.com\/fr\/how-to-choose-supermarket-shelving\/\">guide des \u00e9tag\u00e8res de supermarch\u00e9<\/a> to build a layout and a specification before you request quotes. For a project-specific review, send the floor plan and schedule to <a href=\"https:\/\/www.dahaishelf.com\/fr\/contact\/\">notre \u00e9quipe<\/a>.<\/div>\n  <div class=\"sa-tags\"><em>store fit-out checklist<\/em><em>supermarket fit-out<\/em><em>shelving schedule<\/em><em>store planning<\/em><\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"A step-by-step store fit-out checklist covering scope, shell measurement, shelving schedules, refrigeration and electrical coordination, checkout planning and handover inspection.","protected":false},"author":1,"featured_media":3422,"comment_status":"closed","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[38,1],"tags":[51,47,53],"class_list":["post-3423","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-buyers-guide","category-news","tag-retail-shelving","tag-store-design","tag-store-fixtures"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.dahaishelf.com\/fr\/wp-json\/wp\/v2\/posts\/3423","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.dahaishelf.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.dahaishelf.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.dahaishelf.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.dahaishelf.com\/fr\/wp-json\/wp\/v2\/comments?post=3423"}],"version-history":[{"count":0,"href":"https:\/\/www.dahaishelf.com\/fr\/wp-json\/wp\/v2\/posts\/3423\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.dahaishelf.com\/fr\/wp-json\/wp\/v2\/media\/3422"}],"wp:attachment":[{"href":"https:\/\/www.dahaishelf.com\/fr\/wp-json\/wp\/v2\/media?parent=3423"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.dahaishelf.com\/fr\/wp-json\/wp\/v2\/categories?post=3423"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.dahaishelf.com\/fr\/wp-json\/wp\/v2\/tags?post=3423"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}